Connectors for electrical and electronic equipment. Tests and measurements - Screening and filtering tests. Test 23c: Shielding effectiveness of connectors and accessories. Line injection method not-eligible Tests for local effects after
$166.00
Description
Tests for local effects after implantation
Using four specified Levels of Assurance (LoAs)
ISO 8100-1 and ISO 8100-2 address the requirements in many parts of the world
from very coarse work to fine gauge manufacture
Connectors for electrical and electronic equipment. Tests and measurements - Screening and filtering tests. Test 23c: Shielding effectiveness of connectors and accessories. Line injection method not-eligible Tests for local effects afterWhat is this standard about? This part of IEC 60512 defines a standard test method for measuring the shielding effectiveness SE of a shielded connector, or of a connector not provided with integral shield once fitted with a shielding accessory and terminated with a screened cable. The complete assembly has a continuous 360 shielding capability throughout its length. This test method can be applied to shielded connectors and to connector accessories
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
You may also like
US$ 155.00
US$ 10.00
US$ 10.00
US$ 10.00
US$ 10.00
US$ 300.00
US$ 10.00
US$ 1100.00